The loco shed has been completed and is ready for placement on the layout. Progress pics can been seen under Structures in the menu.
This blog is a summary of the progress of the building of an N scale layout representing Strathalbyn station and yards in South Australia. The era being modelled is the 1960s. The Aus-moN free form modular system was chosen as the basis for construction. Besides operational use, the layout is also suitable for display. As Strathalbyn station is still in use today by tourist trains of SteamRanger, a swap era may be considered to add variety. (by the Southern N Scale Modellers informal group)
Sunday, 13 April 2014
Monday, 18 November 2013
Bridges Module
Construction of the Bridges module has begun. A progress report and pics can be viewed under Bridges in the menu.
Sunday, 15 September 2013
First Public Display
The first public display was held at the Miniature & Model Railway Show which was part of the events to celebrate the 50th anniversary of the National Railway Museum. This was held on the 14th & 15th September at the museum's location in Port Adelaide. The layout was exhibited as a display by Southern N Scale Modellers.
Although the layout was displayed as a work in progress, all tracks were operational and trains were running. Both completed and part-completed structures were on display. Structures were built by various members of the team. Many thanks to Stuart, Greg, Mark, Rodney and Peter for their work and support for the project to date.
Additional modules for Strathalbyn (namely, the Bridges module and the Mill & Silos module) are currently under construction by other members in the team.
If there is sufficient interest from other modellers, Mt Barker, Goolwa, Victor Harbor, etc modules could be made and to hence have combined running at, say, a 'Fleurieu Peninsular Railway' Meet. A diagram of a possible combination of some individual modules to do this may be perused at - fleurieu-peninsula-railway.blogspot.com.au
Tuesday, 20 August 2013
Goods Shed Progress
Scratchbuilding of the Goods Shed has begun. Progress pics can be viewed under Structures in the menu.
Sunday, 7 July 2013
Water Tank and Coaling Tower
The Water Tank is almost complete and the Coaling Tower is progressing well. Progress pics may be viewed under Structures.
Wednesday, 19 June 2013
Friday, 1 February 2013
Test Running
The test running session was held recently. In the pic below the 830 class diesel is doing its work.
Friday, 18 January 2013
Command Bus Cable Installed
The Command bus cable and interconnection surface mounted sockets have been installed. A
picture may be viewed under Wiring in the menu
Thursday, 27 December 2012
Wiring Completed for Middle Section Module
Wiring has been completed and tested for the middle section module. A picture may be viewed under Wiring in the menu. Wiring will commence soon on the two outer section modules.
Thursday, 15 November 2012
Commencement of Wiring
With the completion of the multi-track butt-joins between the three sections, wiring is to begin. An initial wiring schematic and sample connectors can be viewed at the Wiring page.
Wiring has begun on the middle section module. Wiring is a slow process. A picture of the middle section wiring will be uploaded when it is completed.
Wiring will be completed and track operation tested before any track is permanently tied in position. Full operational running will be carried out before any ballasting is considered.
Wiring has begun on the middle section module. Wiring is a slow process. A picture of the middle section wiring will be uploaded when it is completed.
Wiring will be completed and track operation tested before any track is permanently tied in position. Full operational running will be carried out before any ballasting is considered.
Subscribe to:
Posts (Atom)


.jpg)

