Saturday 20 October 2012

Track Placement Completion

All the yard trackage has now been tacked in place with track pins. The 'bake & cooking paper' was ripped away, except for the pieces showing the location of the station and the goods shed. The next stage will be the making of the butt-joins at the two interfaces of the sections. The ends of the outer modules are still to have the end-plates fitted.

No comments:

Post a Comment